Systems security breach deflected
Systems security breach deflected
Systems security breach at 504, black alert
Pandora in progress, ongoing gamma grid ratio disruption, L2LSIP temporary abort, Project 502 on hold. GR+. Drastic VTX / Systems security breach at 504, deflected. Minimum M / HP requirements met, VTX / SD / DL requirements not met.
VTX stable, systems clear
L4 Pandora sequence in progress, project 501 merged into MASTERPIECE. VTXC systems security breach deflected. Minimum M / DL / HP requirements met, VTX and SD requirements not met.
MOSS Pandora sequence in progress, project 501 to merge into MASTERPIECE at ST point. VTXC systems security breach, in deflection, brief RM2m L0 MASTERPIECE sequence prevented L0 collapse. Minimum M / DL / HP requirements met, VTX and SD requirements...
EXMOSS clear clear, MOSS Pandora sequence in progress. Project 061 downgraded, project 501 to merge into MASTERPIECE at ST point. VTXC systems security breach, in deflection. Minimum M / DL / HP / VTX requirements met, SD requirements not met.
VTXC systems security breach at 504, EXMOSS clear clear, MOSS 08/10 sequence in progress
EXMOSS Pandora sequence in progress. Project 310 total abort due to security breach, systems security breach recovery in progress. Minimum M / HP / VTX requirements met, SD requirements not met, DL requirements not met.
EXMOSS Pandora sequence in progress, N22 downgraded to N20. Project 501 final integration into MASTERPIECE delayed due to unfavorable grid ratio, internal YXR flow / multiphasic recovery (n=3) almost complete. Drastic VTXC/Systems security breach, re...
VTXC/Systems security breach at 504
Systems alert downgrade to yellow
Systems alert upgrade to red
This work is licensed under a Creative Commons Attribution 4.0
International License.
unless otherwise marked.
Terms of Use | Privacy Policy
— Up ↑ —
Comments