Tag: Removal (page 1 of 4)

Endtime Madness Update

The coronavirus scare has manged to keep a large part of human population in fear and a large proportion of China under quarantine.Having so many people quarantined has enabled the Light Forces to completely clear all plasma Chimera spiders and all oth...

View Article Here Read More

Blue Dawn

Age of Aquarius meditation was very successful and we have reached the critical mass, albeit barely. Around 150,000 people were actively participating:https://www.youtube.com/watch?v=33Yb3_60gwE&feature=youtu.beThis was just enough to push us over ...

View Article Here Read More

STATE OF MISSION REPORT JUNE 2019

EXMOSS Pandora sequence in progress, cosmic rootkit detected, removal in progress, N22 detected, removal in progress. Project 501 final integration into MASTERPIECE in progress, internal YXR flow / multiphasic recovery in progress, PB recovery failur...

View Article Here Read More

The Portal 2019-06-05 15:16:00

GDSR infection removal complete, evaluate DELS

View Article Here Read More

The Portal 2018-03-01 02:45:00

Merge Pandora / B96 removal, merge EELA / VTXC

View Article Here Read More

STATE OF MISSION REPORT FEBRUARY 2018

Pandora in progress, EELA in progress, B96 removal in progress, Wipeout sequence in progress.  741L50 recovery, VTX realignment in position, minimum hyperphasic requirements not met, minimum VTXPOS requirements not met, contact established at VTXP...

View Article Here Read More

STATE OF MISSION REPORT JANUARY 2018

Pandora in progress, EELA in progress, B96 removal in progress. Fatal Systems/Isidic security breach, fatal 741 disruption, HVBN fatal termination. Damage control (P501, GDSVTX) in progress. Wipeout sequence in progress. COBRA upgraded. M minimum r...

View Article Here Read More

STATE OF MISSION REPORT 2017

Cobra in progress, Pandora in progress, EELA in progress. Two drastic systems / Isidic security breaches, one nearly fatal, all deflected, HVBN mainly stable. Several PB removal attempts, some with drastic PPN intrusions with overall failure. M minimum...

View Article Here Read More

STATE OF MISSION REPORT DECEMBER 2017

Pandora in progress, EELA in progress, B96 removal in progress. Drastic Systems/Isidic security breach, grid ratio failure, in deflection. HVBN substable to stable, M minimum requirements met.

View Article Here Read More

STATE OF MISSION REPORT NOVEMBER 2017

Pandora in progress, EELA in progress, B96 removal in progress. Drastic Systems/Isidic security breach, PPN security breach deflected, PB removal attempt failure. HVBN stable, M minimum requirements met.

View Article Here Read More

STATE OF MISSION REPORT OCTOBER 2017

Pandora in progress, EELA in progress, B96 removal in progress. Systems/Isidic security breach deflected, PPN security breach deflected, PB removal attempt in progress, alert downgrade to yellow at 504. HVBN stable, M minimum requirements met.

View Article Here Read More

STATE OF MISSION REPORT SEPTEMBER 2017

Pandora in progress, EELA in progress, B96 removal in progress. Systems/Isidic security breach deflection in progress, red alert at 504. PB removal attempt in progress, drastic PPN security breach, in deflection. HVBN  substable to stable. M min...

View Article Here Read More

The Portal 2017-09-01 08:07:00

PPN black alert at 504, full force removal attempt in progress

View Article Here Read More
Older posts

Creative Commons License
This work is licensed under a
Creative Commons Attribution 4.0
International License
.
unless otherwise marked.

Terms of Use | Privacy Policy



Up ↑