Tag: isidic (page 1 of 5)

The Portal 2020-08-01 13:36:00

Drastic Isidic security breach at 504, grid ratio failure

View Article Here Read More

The Portal 2018-05-20 06:37:00

Isidic approval for ASCOM sequence

View Article Here Read More

STATE OF MISSION REPORT JANUARY 2018

Pandora in progress, EELA in progress, B96 removal in progress. Fatal Systems/Isidic security breach, fatal 741 disruption, HVBN fatal termination. Damage control (P501, GDSVTX) in progress. Wipeout sequence in progress. COBRA upgraded. M minimum r...

View Article Here Read More

The Portal 2018-01-31 00:58:00

Fatal Isidic / Systems security breach at 504. Fatal 741 disruption. Wipeout sequence L3 to L0 approved. COBRA upgrade evaluated and approved. MIL instruction complete. Evaluate Project 501. Evaluate GDSVTX.

View Article Here Read More

The Portal 2018-01-26 14:59:00

Black Isidic / Systems alert at 504

View Article Here Read More

STATE OF MISSION REPORT 2017

Cobra in progress, Pandora in progress, EELA in progress. Two drastic systems / Isidic security breaches, one nearly fatal, all deflected, HVBN mainly stable. Several PB removal attempts, some with drastic PPN intrusions with overall failure. M minimum...

View Article Here Read More

STATE OF MISSION REPORT DECEMBER 2017

Pandora in progress, EELA in progress, B96 removal in progress. Drastic Systems/Isidic security breach, grid ratio failure, in deflection. HVBN substable to stable, M minimum requirements met.

View Article Here Read More

The Portal 2017-12-18 15:22:00

Isidic grid ratio failure

View Article Here Read More

The Portal 2017-12-16 16:28:00

Drastic Isidic/Systems security breach at 504, black alert, grid ratio failure

View Article Here Read More

STATE OF MISSION REPORT NOVEMBER 2017

Pandora in progress, EELA in progress, B96 removal in progress. Drastic Systems/Isidic security breach, PPN security breach deflected, PB removal attempt failure. HVBN stable, M minimum requirements met.

View Article Here Read More

The Portal 2017-11-20 15:14:00

Drastic Isidic/systems security breach, red alert at 504

View Article Here Read More

STATE OF MISSION REPORT OCTOBER 2017

Pandora in progress, EELA in progress, B96 removal in progress. Systems/Isidic security breach deflected, PPN security breach deflected, PB removal attempt in progress, alert downgrade to yellow at 504. HVBN stable, M minimum requirements met.

View Article Here Read More

Alert Status Report

PB red, PPN yellow, Systems green, Isidic/Systems yellow, Isidic green, MDS green

View Article Here Read More
Older posts

Creative Commons License
This work is licensed under a
Creative Commons Attribution 4.0
International License
.
unless otherwise marked.

Terms of Use | Privacy Policy



Up ↑