Drastic Isidic security breach at 504, grid ratio failure
Drastic Isidic security breach at 504, grid ratio failure
Isidic approval for ASCOM sequence
Pandora in progress, EELA in progress, B96 removal in progress. Fatal Systems/Isidic security breach, fatal 741 disruption, HVBN fatal termination. Damage control (P501, GDSVTX) in progress. Wipeout sequence in progress. COBRA upgraded. M minimum r...
Fatal Isidic / Systems security breach at 504. Fatal 741 disruption. Wipeout sequence L3 to L0 approved. COBRA upgrade evaluated and approved. MIL instruction complete. Evaluate Project 501. Evaluate GDSVTX.
Black Isidic / Systems alert at 504
Cobra in progress, Pandora in progress, EELA in progress. Two drastic systems / Isidic security breaches, one nearly fatal, all deflected, HVBN mainly stable. Several PB removal attempts, some with drastic PPN intrusions with overall failure. M minimum...
Pandora in progress, EELA in progress, B96 removal in progress. Drastic Systems/Isidic security breach, grid ratio failure, in deflection. HVBN substable to stable, M minimum requirements met.
Isidic grid ratio failure
Drastic Isidic/Systems security breach at 504, black alert, grid ratio failure
Pandora in progress, EELA in progress, B96 removal in progress. Drastic Systems/Isidic security breach, PPN security breach deflected, PB removal attempt failure. HVBN stable, M minimum requirements met.
Drastic Isidic/systems security breach, red alert at 504
Pandora in progress, EELA in progress, B96 removal in progress. Systems/Isidic security breach deflected, PPN security breach deflected, PB removal attempt in progress, alert downgrade to yellow at 504. HVBN stable, M minimum requirements met.
PB red, PPN yellow, Systems green, Isidic/Systems yellow, Isidic green, MDS green
This work is licensed under a Creative Commons Attribution 4.0
International License.
unless otherwise marked.
Terms of Use | Privacy Policy
— Up ↑ —
Comments