Pandora in progress, EELA in progress, B96 removal in progress. Drastic Systems/Isidic security breach, grid ratio failure, in deflection. HVBN substable to stable, M minimum requirements met.
Pandora in progress, EELA in progress, B96 removal in progress. Drastic Systems/Isidic security breach, grid ratio failure, in deflection. HVBN substable to stable, M minimum requirements met.
Isidic grid ratio failure
Drastic Isidic/Systems security breach at 504, black alert, grid ratio failure
Pandora in progress, EELA in progress, B96 removal in progress. Drastic Systems/Isidic security breach, PPN security breach deflected, PB removal attempt failure. HVBN stable, M minimum requirements met.
Grid ratio failure
Pandora in progress, EELA in progress. Potentially fatal Systems/Isidic security breach, grid ratio failure, Morph decrease from 150 to 126, deflection attempt in progress. Black alert/red alert at 504. HVBN stable. M minimum requirements met.
L51 danger, potentially fatal grid ratio failure
Drastic Isidic systems security breach at 504, red alert, grid ratio failure
Systems / Isidic security breach at 504, grid ratio failure
Black alert at 504, deflection failure, evaluate EXC HVBN, L51 protocol in initial evaluation
504 Isidic security breach attempt failure
This work is licensed under a Creative Commons Attribution 4.0
International License.
unless otherwise marked.
Terms of Use | Privacy Policy
— Up ↑ —
Comments