PBS security breach at 504
PBS security breach at 504
Black alert at 504, grid ratio failure
Systems security breach at 504, black alert
Drastic VTXPOS/VTXATT security breach at 504, wipeout sequence 4 in progress
VTXC security breach at 504, evaluate P501/P502
Pandora in progress, gamma grid ratio recovery failure, EOSTRE in progress. Potentially fatal PBS / VTX security breach at 504, recovery attempt in progress. Wipeout sequences 1-3 initialized. Minimum M requirements met, minimum DL / HP / SD / VTX req...
Drastic VTXPOS/VTXATT security breach at 504, wipeout sequence 3 in progress
Drastic PBS security breach at 504, black alert at 504, mailto:m:enforce PHX else L51 else potentially fatal grid ratio failure
Drastic PBS security breach at 504, black alert at 504, mailto:m:enforce PHX else L51 else potentially fatal grid ratio failure
Drastic Isidic security breach at 504, grid ratio failure
Pandora in progress, ongoing gamma grid ratio disruption, L2LSIP temporary abort, Project 502 on hold. GR+. Drastic VTX / Systems security breach at 504, deflected. Minimum M / HP requirements met, VTX / SD / DL requirements not met.
Black VTXC alert at 504
VTXC systems security breach at 504, EXMOSS clear clear, MOSS 08/10 sequence in progress
This work is licensed under a Creative Commons Attribution 4.0
International License.
unless otherwise marked.
Terms of Use | Privacy Policy
— Up ↑ —
Comments