Site icon Dimensional Bliss

STATE OF MISSION REPORT JULY 2023

Pandora
in progress, M
signal field substable with stabilization attempts. DEMATRIX reattempt in progress, wipeout
sequence 9 in
progress.
Multiple systems security breach at 504 deflected. Minimum M / HP
/ SD / DL / MDS  requirements met, VTX  requirements not
met.
  

Exit mobile version